Subsidiaries / Ocean Vantage Engineering Sdn Bhd

Ocean Vantage Engineering Sdn Bhd

OUR TEAM

Driven by talented and skillful professionals, we're set to deliver highest standards of quality while ensuring customer's satisfaction as top priority. Lead by hands-on and experienced Directors, our Management Team inspired to reach another level of business and operational excellence.

500+

Employees (Permanent and contract personnel)

>500

Projects(Onshore & Offshore)

>5,000,000

PMan-hours at work site

Our SERVICES

OFFSHORE

Accommodation Refurbishment

Blasting & Painting Services

Industrial Cleaning / Waterjetting

Read More >>

Fabrication Construction Structures

Read More >>

Skilled manpower supply

Read More >>

Scaffolding Services

Crane, Structural, Piping Replacement

Rig / Platform Modifications

Marine Security Services

Read More >>

Equipment Rental

ONSHORE

Process Design and Installation

Site Survey / Work Scoping

EPCIC

Rig Stacking & Reactivation

Rig Repair & Maintenance

Civil, M&E, Instrumentation New Construction

Commissioning, Start-Up, and Turnaround of Systems

Maint Repair & Overhaul

Conventional NDT & Inspection

Overhaul and Maintenance Projects for Refineries and Petrochemical Complexes

Key Project Highlight

PETROFAC, BAGSF-2 PROJECT

APRIL 2021, BINTULU, SARAWAK

Provision of Subcontracting works for Civil, Building and Piling Works for a new onshore gas plant owned by PETRONAS Carigali Sdn Bhd, the Bintulu Additional Gas Sales Facilities (BAGSF-2) at Bintulu, Sarawak.

SAPURA ESPERANZA BUOY REPAIR

MAY 2021, LABUAN

Provision of manpower, materials, tools, consumables of 6 marine buoys. Inclusive of sandblasting and painting to 3 coat painting systems. Project duration 2-3 weeks.

VELESTO, NAGA 3 TANK REPAIR WORKS

JUN 2021, TG LANGSAT PORT, JOHOR

Provision of manpower, materials, tools, consumables for tank cleaning, repair works for mud pit #5, slug pit and mud pit deck onboard Naga 3.

ABF 14TH TURNAROUND (WORK PACK NO. 1)

OCT 2018, BINTULU, SARAWAK

Provision of manpower, materials, tools, consumables for Work Pack No. 1, installation of vent line for safety valves and inert vent line. Removal of temporary piping and its associated pipe supports and re-install back permanent piping once turnaround works completed.

ABF 14TH TURNAROUND (WORK PACK NO. 2)

OCT 2018, BINTULU, SARAWAK

Provision of manpower, materials, tools, consumables for Work Pack No. 2, to perform inspection, maintenance and testing of the PHX (2 Nos). Construct new foundation and modify existing foundation. Installation of PHX, tie-in works, fabrication of associated piping and installation.

ABF 14TH TURNAROUND (WORK PACK NO. 3)

OCT 2018, BINTULU, SARAWAK

Provision of manpower, materials, tools, consumables for Work Pack No. 3, construction and installation of permanent access platform and the CEMS tapping point inclusive of permanent access platform installation for boiler stack.

MLNG, HOT TAPPING WORKS

NOV 2018, BINTULU, SARAWAK

Provision of spool replacement via hot tapping and line stopping at 8” line pipe. Supply of manpower, materials, equipment, tools and consumables for required work.

TRANSOCEAN,DEEPWATER NAUTILUS REACTIVATION WORKS

JAN 2017-FEB 2018, LABUAN

Reactivation works for Shell Malaysia, EPCC provision for supplying and delivery of manpower, equipment, tools, equipment and consumables for fabrication works of structural and piping replacement, installation, NDT inspection works, rope access, blasting and painting, manpower and equipment rental.

SHELL BRUNEI, MUARA TERMINAL PIPE REPLACEMENT WORKS

OCT 2016, BRUNEI

Provision of manpower, materials, tools, consumables and equipment for replacement of corroded brine plant piping located in STL/4 (Muara Terminal).

ENSCO, 5001 STAIRCASE FABRICATION

DEC 2015, JOHOR ANCHORAGE

Provision of manpower, equipment, tools and consumables for designing, fabricating and installing a 25m access staircase, pontoon to lower deck level.

SEADRILL, WEST TELESTO REACTIVATION WORKS

NOV 2014, LABUAN

Reactivation works for PCSB contract, EPCC provision for supplying and delivery of manpower, equipment, tools, equipment and consumables for fabrication works of structural and piping replacement, installation, NDT inspection works, rope access, blasting and painting, manpower and equipment rental.

FABRICATION OF PAR PIN

APR 2014, LABUAN

Provision of manpower, materials, tools, consumables and equipment for fabrication of PAR pin and blasting painting to 3 coat marine paint system for offshore platform Bokor A & C.

Call us today at +603-5886 2555 or Email us at info@ovbhd.com

Call Us Now

INDUSTRIAL CLEANING HIGH PRESSURE WATER JETTING

We've catered and delivered numerous number of HPWJ assignments, be it for routine Tank Cleaning work or Surface Preparation work purposes, we have what it takes. Our in-house UHPWJ units are available in Labuan and Johor.

FABRICATION, CONSTRUCTION, INSTALLATION

Simply our bread and butter. We've accumulated countless experience and proven portfolio of various new construction or repair steel fabrication and installation works. Low pressure, high pressure piping, structural or process equipment, we have what it takes.

SKILLED MANPOWER SUPPLY

For brownfield MRO routine operational needs to greenfield new project, OVE cater pool of skilled and semi skilled manpower of various trades. Drilling maintenance crew, welder, fitter, scaffolder, blaster painter, E&I personnel, diver and other various oil & gas professionals.

MARINE SECURITY SERVICES

Your asset is always at high stake, AIB designed to protect from unauthorized marine intrusion. OVE in the past has been delivering turnkey solution/service for provision of manpower, material, consumables to install Anti Intrusion Barrier for marine floating assets.