Ocean Vantage Engineering Sdn Bhd
OUR TEAM
Driven by talented and skillful professionals, we're set to deliver highest standards of quality while ensuring customer's satisfaction as top priority. Lead by hands-on and experienced Directors, our Management Team inspired to reach another level of business and operational excellence.
500+
Employees (Permanent and contract personnel)
>500
Projects(Onshore & Offshore)
>5,000,000
PMan-hours at work site
Our SERVICES
OFFSHORE
Accommodation Refurbishment
Blasting & Painting Services
Industrial Cleaning / Waterjetting
Read More >>
Fabrication Construction Structures
Read More >>
Skilled manpower supply
Read More >>
Scaffolding Services
Crane, Structural, Piping Replacement
Rig / Platform Modifications
Marine Security Services
Read More >>
Equipment Rental
ONSHORE
Process Design and Installation
Site Survey / Work Scoping
EPCIC
Rig Stacking & Reactivation
Rig Repair & Maintenance
Civil, M&E, Instrumentation New Construction
Commissioning, Start-Up, and Turnaround of Systems
Maint Repair & Overhaul
Conventional NDT & Inspection
Overhaul and Maintenance Projects for Refineries and Petrochemical Complexes
Key Project Highlight
PETROFAC, BAGSF-2 PROJECT
APRIL 2021, BINTULU, SARAWAK
Provision of Subcontracting works for Civil, Building and Piling Works for a new onshore gas plant owned by PETRONAS Carigali Sdn Bhd, the Bintulu Additional Gas Sales Facilities (BAGSF-2) at Bintulu, Sarawak.
SAPURA ESPERANZA BUOY REPAIR
MAY 2021, LABUAN
Provision of manpower, materials, tools, consumables of 6 marine buoys. Inclusive of sandblasting and painting to 3 coat painting systems. Project duration 2-3 weeks.
VELESTO, NAGA 3 TANK REPAIR WORKS
JUN 2021, TG LANGSAT PORT, JOHOR
Provision of manpower, materials, tools, consumables for tank cleaning, repair works for mud pit #5, slug pit and mud pit deck onboard Naga 3.
ABF 14TH TURNAROUND (WORK PACK NO. 1)
OCT 2018, BINTULU, SARAWAK
Provision of manpower, materials, tools, consumables for Work Pack No. 1, installation of vent line for safety valves and inert vent line. Removal of temporary piping and its associated pipe supports and re-install back permanent piping once turnaround works completed.
ABF 14TH TURNAROUND (WORK PACK NO. 2)
OCT 2018, BINTULU, SARAWAK
Provision of manpower, materials, tools, consumables for Work Pack No. 2, to perform inspection, maintenance and testing of the PHX (2 Nos). Construct new foundation and modify existing foundation. Installation of PHX, tie-in works, fabrication of associated piping and installation.
ABF 14TH TURNAROUND (WORK PACK NO. 3)
OCT 2018, BINTULU, SARAWAK
Provision of manpower, materials, tools, consumables for Work Pack No. 3, construction and installation of permanent access platform and the CEMS tapping point inclusive of permanent access platform installation for boiler stack.
MLNG, HOT TAPPING WORKS
NOV 2018, BINTULU, SARAWAK
Provision of spool replacement via hot tapping and line stopping at 8” line pipe. Supply of manpower, materials, equipment, tools and consumables for required work.
TRANSOCEAN,DEEPWATER NAUTILUS REACTIVATION WORKS
JAN 2017-FEB 2018, LABUAN
Reactivation works for Shell Malaysia, EPCC provision for supplying and delivery of manpower, equipment, tools, equipment and consumables for fabrication works of structural and piping replacement, installation, NDT inspection works, rope access, blasting and painting, manpower and equipment rental.
SHELL BRUNEI, MUARA TERMINAL PIPE REPLACEMENT WORKS
OCT 2016, BRUNEI
Provision of manpower, materials, tools, consumables and equipment for replacement of corroded brine plant piping located in STL/4 (Muara Terminal).
ENSCO, 5001 STAIRCASE FABRICATION
DEC 2015, JOHOR ANCHORAGE
Provision of manpower, equipment, tools and consumables for designing, fabricating and installing a 25m access staircase, pontoon to lower deck level.
SEADRILL, WEST TELESTO REACTIVATION WORKS
NOV 2014, LABUAN
Reactivation works for PCSB contract, EPCC provision for supplying and delivery of manpower, equipment, tools, equipment and consumables for fabrication works of structural and piping replacement, installation, NDT inspection works, rope access, blasting and painting, manpower and equipment rental.
FABRICATION OF PAR PIN
APR 2014, LABUAN
Provision of manpower, materials, tools, consumables and equipment for fabrication of PAR pin and blasting painting to 3 coat marine paint system for offshore platform Bokor A & C.

